Data Center Locations
Our business is focused on creating the essential infrastructure for multi-national corporations, enterprise occupiers and colocation operators requiring data center facilities in China. Operating in key locations across China, Chayora develops large, fully licensed sites ready for data center construction and operations and access to the internet. All Chayora sites meet international construction, management and security standards and typically offer 300MW of grid power supply with an objective to supply more than 50% of power from clean, green and sustainable power sources. The sites are fully provisioned and offer world-class fibre connectivity from multiple providers.
On Chayora sites customers can choose from different service options including Powered Land, Build-to-Suit, Assured Scalability and Wholesale Colocation.

Shanghai Data Center Campus
Shanghai is one of China’s largest cities and is situated on the banks of the Yangtze River. The city’s development in the past few decades has made it one of the most important economic, commercial, financial and communications centers of China.
The city has a population of circa 24 million and is developing rapidly as one of Asia’s largest financial centers.
The Shanghai Site
In Shanghai, Chayora is developing an international data center campus that enables multi-national corporations to develop global standard data centers to support their enterprise and cloud requirements.
Shanghai Data Center – Site Overview
- Chayora’s Shanghai Campus is located c.80km from the Shanghai Pudong CBD
- Campus area of c.50mu / 8.5acres / 3.33 hectares
- Fully permitted, ESA power and fibre secured, ready to construct multi–phased options: construction underway
- A modular concept design based on the Chayora Standard Design developed in Tianjin is fully customisable for Built to Suit customers and larger colocation or wholesale requirements
- 120MVA / 60MVA of dual feed gross power sufficient to support 48MW+ IT load on a 2N supply
- Dual routed, independent connection power supply through separate dedicated sub-stations
- Full renewable energy options available
- Physical access control security, full infrastructure management and site operations
- Ready for Service from end 2022
- Directly owned (100%) land and assets by Chayora
Shanghai Data Center – Key Benefits
- Phased development and opportunities for scalable growth to match customers’ business expansion
- ESA-assured power secured to meet customers’ immediate and future needs
- Access to Shanghai CBD via ultra-high speed connections
- Carrier neutral with a wide range of telecom services will be available from tier-one carriers as well as other tier two carriers (including China Telecom, China Mobile, China Unicom, CITIC)
- Flexibility to interconnect and cross connect within the campus
- Fully Chayora-licensed (IDC, ISP and IRCS) operations and managed to international standards in engineering, facilities, security, construction and overall performance
- Highly competitive power tariff and Total Cost of Ownership (TCO) with assured PUE
- Complete BPO (Data Centre as a Service) possible to exacting standards
- Dedicated international supply chain
Shanghai 1 – Campus Layout

Shanghai 1 – Design Principles
Standards | Like our existing Tianjin campus, Shanghai will be Uptime Tier III & OCP READY™ accredited |
Design Principles (in each of the 3 buildings) |
Each floor designed to a high level of availability and flexibility. Able to seamlessly scale up from an IT load of 2 MW up to 4MW and to accommodate a minimum of 672 x 19” racks, at power density from 4kW up to 15kW/rack without special modifications. Level 1: Office & Mechanical Plant; Level 2-6: Data Centre; Level 2-6: Flexi Space / Office along perimeter; Roof: Cooling Towers |
Power Density | 4kW – 15kW / rack (higher densities can be accommodated) |
Rack Count (Per Floor) | A minimum of 672 nos. 19” racks @ 6kW/racks (wholesale) |
Floor Loading | 15kN/sqm |
UPS Redundancy | DR (N+1) configurable to 2N with up to 15 mins battery back-up |
Generator Redundancy | N+1 with 12 Hrs diesel fuel backup (all genset based on continuous operation) |
Chiller & Mechanical Cooling Redundancy | N+1 with 15 mins cooling storage backup |
Power Topology for Chiller & Mechanical | 2N with A & B source from UPS backed utility power, Gensets as a backup power |
Environmental Envelope | Temperature: 23 – 27 deg C; Humidity: 30% – 70% |
Annualized PUE | Less than 1.25 (annualised average) |
Monitoring | Power / temperature monitoring @ individual rack basis |
Security | Minimum 8 layers of security checks using access cards, iris scanner and video analytics |
Fire Protection | Pre-action sprinkler, gas suppression and VESDA |
Site Selection Criteria
- Direct and aligned political support: license and strategic interest
- Wide client demand
- Power price & availability
- Suitable land availability
- Fibre connectivity
- Water supply